Rotary Tuna Flake and Oil Dosing System: Mass Flow Kinematics & Sizing
Engineering guide for Tuna Oil Doser focusing on mass flow kinematics & sizing: ...

A sanitary pump should be selected for a defined transfer duty. Review liquid, temperature, viscosity, solids, required flow and system pressure together with the suction and discharge arrangement. A family name alone is not enough to select a unit for a canning process.
Potential duties include moving water, brine, syrup, sauce or another process liquid between preparation, holding and filling. Each duty needs its own fluid description and piping information. List product transfer and cleaning-return duties separately.
Provide the operating range, including startup, production, interruptions and cleaning. Identify changes in product properties with temperature or recipe.
| Family or duty | Questions for review |
|---|---|
| Centrifugal pumps | What liquid properties, flow, system head and suction conditions apply? |
| Rotary-lobe and screw pumps | What viscosity, solids, pressure and product-handling duty must be assessed? |
| Emulsifying pumps | Is in-line mixing required as well as transfer, and what result must be evaluated? |
| Sinusoidal pumps | What product properties and transfer requirements must the proposed model satisfy? |
| Pneumatically driven pumps | What is the fluid duty and what air supply is available? |
| Return-service pumps | What are the return conditions and which design is proposed? |
Material options listed for this family include SUS304 and SUS316L. Identify wetted materials and seals for the actual product and cleaning conditions. Match connections to the piping standard used at the site.
Review source vessel, suction level, piping route, valves, fittings and destination pressure. The downstream machine may impose a transfer schedule or interface requirement different from the average production rate.
For a filling supply duty, identify how pump and filler coordinate. For cleaning return, describe the circuit and operating conditions. Include signals and package responsibilities in the agreed scope.
For replacement equipment, provide existing pump identification, conditions and reason for replacement. Check the new selection against the required duty rather than dimensions alone.
Use the canning production line overview to describe the wider project. Send the process information for review with the equipment duty, operating conditions and connection requirements.