Arrival inspection connects the shipment received at the factory with the equipment ordered. It is an identity and condition check, not a substitute for factory acceptance, installation checks or product trials.
Plan the receiving task before the delivery arrives. The project needs safe unloading arrangements, the relevant packing information and people authorized to record and act on findings.
Prepare the receiving documents
Obtain the packing list, equipment identifiers, package references and relevant handling information. Match them with the purchase scope. Confirm who receives loose parts, tooling and documents that may arrive in separate packages.
Review the access route and lifting arrangements with competent personnel. This article provides no lifting method or structural approval for an unknown site.

Inspect in a traceable sequence
- Identify the shipment and packages before opening or moving them, using the approved receiving procedure.
- Record visible packaging condition and any relevant findings safely, preserving package references in photographs.
- Reconcile the received items against the packing list and equipment schedule.
- Identify missing, unmatched or visibly damaged items without assuming their cause.
- Assign follow-up and control the item's status before installation or use.
Keep original evidence and relevant transport records. Commercial notice requirements depend on the actual contract and transaction; refer those questions to the responsible purchasing or logistics owner.
Distinguish a finding from an acceptance decision
A signed receipt may not describe the technical condition of every component. Use the project's agreed method to document findings and any restrictions. Do not label equipment fit for operation merely because the package count matches.
For a retort system or seaming machine, identity should connect to the actual model and configuration documents. A similar-looking part is not proof that the ordered tooling or option was supplied.
Close the item before the next dependent task
Record the owner, evidence required and authorized next action. An unresolved missing component can affect installation planning; a condition concern may require supplier review before further handling or use.
Use the turnkey scope guide to establish responsibilities. Retain the distinction between pre-shipment tests and arrival evidence, and coordinate site access through the factory planning review.
The completed receiving record should explain what arrived, what was observed and which conditions remain open. It should preserve the evidence needed for technical and commercial follow-up without inventing a cause or silently accepting an unresolved condition.